| Sign In | Join Free | My uabig.com |
|
Place of Origin : Henan, China
Certification : CE
Supply Ability : 10000 Piece/Pieces per Week
Packaging Details : The package for Hot sell bow spring centralizer The plastic packing The carbon painting cap the bubble wrapped the wood packing The wood box
MOQ : 1 Meter/Meters
Price : Negotiation
Standard : ASTM, DIN
Standard2 : ASTM A312-2001, ASTM A312-2007, ASTM A312M-2001, ASTM A358-2005, DIN EN 10216-1-2004
Grade Group : 10#-45#, A53-A369, API J55-API P110
Grade : 10#, 20#, A312, API J55, API K55, API L80, API N80, API P110
Thickness : 0.068 - 1.16 inch
Section Shape : Round
Outer Diameter(Round) : 1 - 22 inch
Application : Oil Pipe
Technique : Cold Drawn
Surface Treatment : passivation
Special Pipe : Thick Wall Pipe
Alloy Or Not : Non-alloy
Product name : 2018 Hot Sale Bow spring centralizerfor fixed well pipe of centralizer
OD : 168MM
size : 168mm-273mm
Length : 62mm
Material : Carbon steel& stainless steel
Secondary Or Not : Non-secondary
Port : Tianjin/Qingdao port
Bow spring centralizer for fixed well pipe of centralizer
2018 Hot Sale Bow spring centralizerfor fixed well pipe of centralizer
1. Grade: SUS201,SUS304,SUS304L, SUS316, SUS316L, duplex2205, 2507
2. Size: 1"-22"
3. Standard: ASTM A312, ASTMA358
4. Certification: ISO9001, SGS, BV, CE
2018 Hot Sale Bow spring centralizerfor fixed well pipe of centralizer
2018 Hot Sale Bow spring centralizerfor fixed well pipe of centralizer
Passed the ISO9001:2008 quality system authentication Sira certificate
Passed SGS inspection and authentication
The bv EN10203.2 certificate
2018 Hot Sale Bow spring centralizerfor fixed well pipe of centralizer
Packing Details : Packing, plastic wrapped, plastic protector cap for Bow spring centralizer
Delivery Details : 3-30 days after the order confrimed
Our goods have been past by the Sira authorized, the BV inspection and issue the certificate for us, the SGS inspection and issue the certification for OASIS the other abroad third inspection inspection and issue the good testing result, welcome to visit and inquiry us about the stainless steel casing-tube-pipes
The water out from the under ground as the golden
This project used our company stainless steel casing and well screen to transfer the water, the water successfully out from the borehole
A: We are factory.
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
|
|
Nickel White Water Well Accessories For Fixed Well Pipe Round Centralizer Images |